Hail-damaged shingle roof, fully replaced in Preston Hollow
A 4,200 sq ft asphalt roof took direct hail during the May storm. Here is exactly what we found, what the inspection proved, and how the replacement was executed — start to finish.
Finished roof — street elevation
Full roof replacement
Architectural asphalt shingle
3 days · 18–21 May 2026
25-year workmanship
What the homeowner was seeing
The 18 May hailstorm dropped 1.75-inch stones across Preston Hollow. Within a week the homeowner noticed granules collecting in the downspouts and two fresh ceiling stains in the upstairs hallway.
The roof was already 19 years old and near the end of its service life, so the storm damage accelerated fast.
Reported issues
Heavy granule loss in gutters and downspouts
Two active leaks staining the upstairs ceiling
Cracked and bruised shingles across the south slope
Dented ridge vent and bent drip edge along the east eave
Hail bruising — south slope
Gutter granule loss
Ceiling stain — hallway
Chalked test square — north slope
Attic moisture reading
Documented strike map
What the inspection actually found
We ran a full exterior and attic inspection the next morning, chalked a 10×10 test square on each slope, and documented every strike with photos and measurements for the insurance file.
The test squares confirmed storm damage well past the carrier's threshold, which moved this from a repair to a full replacement.
Inspection findings
14 hail strikes per 10×10 test square (carrier threshold: 8)
Mat fracture confirmed on 3 of 4 slopes
Decking sound — only 6 sheets needed replacing
Flashing and boots compromised at 4 penetrations
Attic moisture reading 21% at the north bay
What we installed, and how
Full tear-off down to the deck, six sheets of decking replaced, synthetic underlayment across the whole roof, and ice-and-water shield at every valley, eave, and penetration.
The crew worked in three phases so the home was never left open overnight — dry-in was completed the same day the old roof came off.
What we installed
Architectural asphalt shingles, 25-year workmanship warranty
Synthetic underlayment across the full deck
Ice-and-water shield at valleys, eaves, and penetrations
New pipe boots, step flashing, and drip edge
Ridge vent system for balanced attic airflow
Finished roof — south elevation
Tear-off, day one
New underlayment & dry-in
Tear-off & dry-in
Old roof removed, decking inspected, six sheets replaced, full synthetic underlayment installed before dusk.
Shingle installation
Ice-and-water at all valleys and penetrations, then shingle courses run across all four slopes.
Finish & handoff
Ridge vent, flashing details, magnet sweep of the property, final walkthrough and photo handoff.
Dry, warranted, and closed out in three days
The carrier approved the full replacement on the strength of the inspection documentation. The homeowner paid their deductible and nothing else.
"They walked the roof with me, showed me every strike, and handled the whole claim. Three days later it was done and the yard was cleaner than when they arrived."
Marcus D.
Preston Hollow, Dallas TX · May 2026
More case studies
Every case follows the same Problem → Assessment → Solution structure.
Get your free Texas roof inspection
Same-day estimates and a detailed condition report. Tell us about your roof and we'll take it from there.